Home | Cold Cutting | Water Jetting/Blasting | Hydrodemolition | Greenheart | Hot wash | Contact | About |
Port of Liverpool - Dock Gate Repairs
UHP works carried out on the gate included:
Surface preparation & piming, Cold cutting and Greenheart removal.
Home | Cold Cutting | Water Jetting/Blasting | Hydrodemolition | Greenheart | Hot wash | Contact | About |
UHP works carried out on the gate included:
Surface preparation & piming, Cold cutting and Greenheart removal.